Click on the Track Back Link to get an update on the connection of the two cycling trails. Once completed, cyclist will have a bike trail paved from anniston to atlanta covering about 101 miles.

http://ridethisbike.com/2007/06/chief-ladiga-silver-comet-trail.html

2 Responses to “Chief Ladiga Silver Comet Trail Connection – Update”
  1. Joe says:

    FYI, the Chief Ladiga Trail is now completely paved. It is 32.7 miles to the state line, and a total of 95.0 miles to mile 0.0 on the Silver Comet at Mavell Road. That includes roads for the missing gap between US27 and Grady Road on the east side of Cedartown.

  2. The Ride… » Blog Archive » Chief Ladiga Trail Update, Complete from Anniston to Atlanta!!! says:

    [...] Bookmark to: Sphere: Related Contenttags: anniston, atlanta, cycling, pathway foundation, silver comet trail, tarmac, trails to rails,chief ladiga trail [...]

Leave a Reply